Friday, December 24, 2010

SKC: stadium photos and status 12/20 (Part 2 -inside)

Part 1 was photos of the outside

Part 2 is inside/underneath the stadium

If I remember correctly, this is one of the 4 dressing rooms for the stage.


One of the drain pipes for rainwater from the roof...


Emergency generator...


This is the field heating and air conditioning room. The system can pump warm air to trigger grass to come out of hibernation. It can also pump air during events where the field may be covered so the grass will still get oxygen.


The first 2 or 3 truck bays on the left are for TV trucks. They can plug into full connections and broadcast over fiber. The rest are for normal deliveries.


Inside the Supporters Club...


Inside the Supporters Club...


The Supporters Club bar will be along the pipes here...


One of the heaters to keep it warm enough to work...


The boilers...


Main stair case in the Stadium Club...


Hydrotherapy room...


The Sporting Kansas City locker room. The pipes sticking out of the floor is where each players chair will be located. The chairs will include power and data so the players will be able to enjoy music, surf the internet, meditate or whatever their pre-game ritual is for them.


Locker rooms - There are the two main locker rooms (even the visiting locker room will be nicer than most teams home locker room), two auxiliary locker rooms which can be split into two each if needed, a locker room and a meeting room for the coaches and a locker room for the referees.

The rest of the photos can be found in Stadium 12/20 Gallery

3 comments:

  1. SWEET FUCKING JESUS THIS IS BEAUTIFUL I WANNA JERK OFF

    -/buddha

    ReplyDelete
  2. so awesome. i'm going to as many games as i can next year. i've seen so much more sporting kc stuff around town. opening day against chicago and the gold cup games will break in the stadium very nicely!

    ReplyDelete
  3. I wonder if they are going to do stadium tours so that we can see the locker room and different parts of the stadium after it is completed

    ReplyDelete